Setting up a large-scale organic waste conversion facility requires heavy-duty equipment that won't cause unexpected downtime or installation headaches. Engineering firms and project contractors need reliable hardware that seamlessly fits into broader civil plans without requiring months of site preparation. MINGJIA ECO supplies the Industrial Organic Fertilizer Production Fermentation Tank, a vertical aerobic decomposition system engineered specifically to handle massive volumes of manure, sludge, and organic agricultural waste. By maintaining internal temperatures between 65℃ and 80℃, the system completes high-temperature aerobic fermentation in just 6 to 8 days, transforming raw inputs into stable, nutrient-rich organic fertilizer. Designed for rapid installation and long-term durability, it gives contractors a dependable solution for complex environmental engineering projects.
Models
| Model | 11FFG-55 | 11FFG-80 | 11FFG-100 | 11FFG-120 | 11FFG-140 | 11FFG-160 | 11FFG-220 | 11FFG-280 |
| Body Volume | 55m³ | 80m³ | 100m³ | 120m³ | 140m³ | 160m³ | 220m³ | 280m³ |
| Power | 29.25kW | 34.25kW | 39.25kW | 39.25kW | 43.75kW | 43.75kW | 84.25kW | 109.6kW |
| Body Material | Double-layer Stainless Steel | |||||||
| handling capacity | 4-6m³ | 4-6m³ | 6-8m³ | 8-10m³ | 10-12m³ | 12-14m³ | 16-19m³ | 20-24m³ |
| Tip:The Moisture Content of Fresh Chicken Manure is 65-70% | ||||||||
Working principle model

Product Benefits
Fast On-Site Turnaround: Pre-assembled structural elements and modular piping significantly shorten construction schedules, helping contractors meet tight project milestones.
Minimal Footprint: Taking up roughly 80 square meters of ground space, the vertical vessel minimizes civil excavation and foundation work compared to sprawling windrow composting setups.
Built for Corrosive Environments: Heavy-gauge materials and specialized coatings withstand harsh ammonia gases and moisture, drastically cutting down on early maintenance calls.
Lower Operational Costs: Heat-recovery exchangers reuse thermal energy from exhaust air, while low-energy blowers slash electricity usage by up to 40%.

FAQ
Q: How long does it take to assemble and commission the unit on site?
A: Once the reinforced concrete pad is poured and cured, actual mechanical assembly usually takes 3 to 5 days. Our technical team provides detailed civil drawings beforehand and offers remote or on-site commissioning support.
Q: What infrastructure needs to be ready before delivery?
A: You will need a concrete foundation rated for the operational weight, a standard 3-phase industrial power connection, and a water line hookup for the deodorization spray tower. We supply all exact utility specifications early in the design phase.
Q: Does the system operate effectively in freezing winter conditions?
A: Yes. The combination of high-density polyurethane insulation, internal microbial heat production, and integrated heat exchangers keeps the fermentation core above $60^\circ\text{C}$, even in freezing ambient temperatures.
Application




Certification

Cooperation cases


Features






Exhibition


Shipment

Hot Tags: industrial organic fertilizer production fermentation tank, China industrial organic fertilizer production fermentation tank manufacturers, suppliers, 20 gallon fermentation tank, fermentation tank price, fermentation tanks for sale, jacketed unitank, stainless steel fermentation vessel, Urban Sludge Fermentation Tank