Models
| Model | 11FFG-55 | 11FFG-80 | 11FFG-100 | 11FFG-120 | 11FFG-140 | 11FFG-160 | 11FFG-220 | 11FFG-280 |
| Body Volume | 55m³ | 80m³ | 100m³ | 120m³ | 140m³ | 160m³ | 220m³ | 280m³ |
| Power | 29.25kW | 34.25kW | 39.25kW | 39.25kW | 43.75kW | 43.75kW | 84.25kW | 109.6kW |
| Body Material | Double-layer Stainless Steel | |||||||
| handling capacity | 4-6m³ | 4-6m³ | 6-8m³ | 8-10m³ | 10-12m³ | 12-14m³ | 16-19m³ | 20-24m³ |
| Tip:The Moisture Content of Fresh Chicken Manure is 65-70% | ||||||||
Working Principle

The internal process combines gravity-fed vertical flow with accelerated aerobic thermophilic composting. Raw poultry waste and organic bulking agents travel up a sealed conveyor, dropping directly into the upper intake port. Inside the insulated reactor core, a massive central drive shaft rotates custom-angled mixing paddles to keep the heavy biomass loose and moving freely. High-pressure industrial blowers continuously force oxygen up from the base of the tower, providing an optimal environment for native aerobic bacteria to multiply. As these microbes consume the organic waste, their rapid metabolism creates a biological heat spike ranging between 60°C and 70°C. This natural heat destroys pathogens and weed seeds within days, while automated fans vent process air through an odor-trapping biofilter, leaving stable, dry organic fertilizer at the discharge chute.
FAQ
Q: What specific concrete foundation specs do your engineers provide for site prep? A: Because a vertical Poultry Residue Organic Fertilizer Converter Machine concentrates considerable static and dynamic loads on a small footprint, it requires a engineered concrete base pad. We supply detailed civil engineering submittal drawings, showing exact anchoring points, rebar layouts, and weight specifications, well ahead of delivery so your crews can pour the concrete pad early.
Q: How does the system manage high-moisture poultry waste effectively? A: For optimal thermal breakdown and fast throughput, the raw input material should ideally sit at a moisture level of 55% to 65%. If the incoming waste is too wet, your team can easily blend in carbon materials like sawdust, rice husks, or chopped straw before loading the tower.
Q: What is the typical production and delivery timeline for a standard project site? A: Standard industrial configurations take between 30 and 45 business days to complete fabrication, assembly, and full factory stress testing. We coordinate shipping schedules directly with your logistics manager to ensure the hardware arrives exactly when your field crews are ready to assemble it.