For agricultural engineering companies, waste-treatment contractors, and site developers, selecting equipment that integrates into tight project timelines without causing commissioning bottlenecks is critical. When designing modern livestock facilities or waste recycling plants, you need high-capacity machinery that works reliably from day one.
This product description targets Engineering and Project Contractors, focusing heavily on technical durability, structural blueprints, quick installation, and project compliance.
Models
| Model | 11FFG-55 | 11FFG-80 | 11FFG-100 | 11FFG-120 | 11FFG-140 | 11FFG-160 | 11FFG-220 | 11FFG-280 |
| Body Volume | 55m³ | 80m³ | 100m³ | 120m³ | 140m³ | 160m³ | 220m³ | 280m³ |
| Power | 29.25kW | 34.25kW | 39.25kW | 39.25kW | 43.75kW | 43.75kW | 84.25kW | 109.6kW |
| Body Material | Double-layer Stainless Steel | |||||||
| handling capacity | 4-6m³ | 4-6m³ | 6-8m³ | 8-10m³ | 10-12m³ | 12-14m³ | 16-19m³ | 20-24m³ |
| Tip:The Moisture Content of Fresh Chicken Manure is 65-70% | ||||||||
Working Principle

The vertical system utilizes controlled aerobic breakdown, relying on a continuous mechanical process rather than labor-intensive manual handling.
Top-Loading Intake: A heavy-duty bucket elevator or pneumatic feed pipe delivers raw, dewatered waste through the automated top sealing gate.
Forced Aeration Dynamics: High-volume blowers channel air through a series of multi-port aeration nozzles welded directly into the lower mixing arms, saturating the biomass with vital oxygen.
Thermophilic Pasteurization: Microbes multiply fast in this oxygen-rich environment, driving the core temperature up to 60°C. This natural heat cycle completely destroys harmful pathogens and weed seeds.
Scraper Discharge: Heavy-duty internal paddle arms turn the material continuously to prevent crusting. The fully processed organic material drops to the base, where an automated hydraulic scraper moves it out to the discharge conveyor.
FAQ
What are the concrete foundation load-bearing requirements for installation? Because a fully loaded vertical Fertiliser Tank carries substantial weight, we provide custom civil engineering foundation prints based on the specific cubic-meter model you select. Your concrete team will need to pour a reinforced pad capable of supporting the dead weight plus the dynamic forces of the internal mixing arms.
How does the system handle extreme winter conditions on a project site? The tank body is completely wrapped in a high-density, 100mm thick polyurethane thermal barrier. Combined with the intense natural heat generated by the aerobic bacteria, the system maintains its optimal 55–65°C processing temperature without requiring high-draw external electric heating elements.
Can the control system connect to an existing centralized facility SCADA system? Yes. The standard PLC panels we use support Modbus, Profibus, or Ethernet connections. This allows your integration engineers to easily map all temperature, aeration, and motor load data directly to the farm's central control room screen.