Models
| Model | 11FFG-55 | 11FFG-80 | 11FFG-100 | 11FFG-120 | 11FFG-140 | 11FFG-160 | 11FFG-220 | 11FFG-280 |
| Body Volume | 55m³ | 80m³ | 100m³ | 120m³ | 140m³ | 160m³ | 220m³ | 280m³ |
| Power | 29.25kW | 34.25kW | 39.25kW | 39.25kW | 43.75kW | 43.75kW | 84.25kW | 109.6kW |
| Body Material | Double-layer Stainless Steel | |||||||
| handling capacity | 4-6m³ | 4-6m³ | 6-8m³ | 8-10m³ | 10-12m³ | 12-14m³ | 16-19m³ | 20-24m³ |
| Tip:The Moisture Content of Fresh Chicken Manure is 65-70% | ||||||||
Working Principle

The equipment uses a closed-reactor, high-temperature aerobic biological fermentation process. Organic waste enters from the top, and over a short cycle, moves downward via gravity while undergoing rapid decomposition.
Oxygen Delivery: High-pressure blowers force air through aeration nozzles at the base of the tank, keeping the microbial population active.
Thermal Control: As aerobic bacteria break down organic matter, they release natural heat. The tank traps this energy to maintain internal temperatures between $55\text{--}65^\circ\text{C}$, killing off pathogens and weed seeds.
Mechanical Agitation: A heavy-duty internal hydraulic or electric mixing paddle turns the material to prevent compaction and ensure uniform air distribution
Applications




FEATURES
Premium Corrosion Resistance: Built using a high-grade Fermentation Tank Stainless Steel interior wall to completely resist the corrosive ammonia and organic acids generated during waste breakdown.
Integrated Lifting System: Features a built-in hydraulic or bucket elevator setup that feeds raw materials into the top opening efficiently, reducing external crane or loader requirements during daily operations.
Rugged Double-Layer Insulation: The exterior is wrapped in thick polyurethane insulation to prevent heat loss, allowing the system to operate consistently even in sub-zero winter project sites.
PLC Automation Interface: Pre-wired electrical control panels integrate easily with broader facility SCADA systems, letting operators track temperature, oxygen levels, and discharge speeds remotely.
Certification

Cooperation cases


Features






Exhibition


Shipment

FAQ
Q: What are the typical concrete foundation requirements for installation? A: Because these tanks are vertical structures that carry high weight loads when full, they require a reinforced concrete pad. We provide full structural weight calculations and foundation anchor blueprints during the project design phase to assist your civil engineering team.
Q: How does this system handle strict local odor emission laws? A: The tank is completely sealed. All exhaust gases are directed through a dedicated discharge pipe at the top, which connects directly to an industrial bio-filter or water-scrubbing system to eliminate foul odors before venting.
Q: What is the delivery timeline for a custom-spec Fermentation Tank Stainless Steel unit? A: Standard manufacturing typically takes 30 to 45 days. We work closely with project managers to align our shipping dates with your site preparation milestones, ensuring the equipment arrives exactly when your installation crew is ready.
Hot Tags: fermentation tank stainless steel, China fermentation tank stainless steel manufacturers, suppliers, stainless unitank, 60 bbl fermenter for sale, 25l fermentation vessel, Aerobic Compost Tank, 2 bbl jacketed fermenter, 7 bbl fermenter for sale